On a Friday night, the Downtown Celina Square fills in the way it always has: string lights, live music drifting past the veterans memorial, and a wait for a table at more than one restaurant around the green. That crowd is not new. Visitors have been describing the same thing for years: a square that is kept up and bustling, with more restaurants than you'd expect from a small town, and a line if you show up after six.
A short drive south, on Preston Road, something opened last month with no wait at all. Three national retailers, one after another, inside a single week.
That gap says something real about how Celina is actually expanding right now, and it changes where a longtime resident should look for relief first: not downtown, not yet.
Why the Square still feels tiny
Some of the crowding is simple math. Celina's population hit 64,427 as of July 2025, according to Census Bureau estimates released in May 2026, up from 16,739 residents in the 2020 Census. The city added roughly 12,710 people in that single year alone. A downtown built for a ranching town of a few thousand is now serving a city that grew faster than almost anywhere else in the country.
But the more useful number is smaller and more specific. In July, Celina City Council approved Trackside Junction, a $15 million mixed-use project from Nack Development (the same firm behind Frisco's Rail District and Old Town Lewisville) planned for 111 W. Pecan St. The project adds 15,000 square feet of new commercial space. According to a presentation from Celina Economic Development Corporation director Anthony Satarino, that single project increases the total amount of commercial space downtown by 20 percent.
One new building, on one empty parking lot, moves downtown Celina's entire commercial footprint by a fifth.
That is the real story behind the wait for a table. Downtown's existing inventory is small enough that a single mid-size development changes it meaningfully. It also means relief was never going to arrive quickly, because there simply isn't much square footage to work with.
The city isn't stopping at one project. In September, council approved a separate $7.5 million deal with Celina Real Estate LLC covering two more downtown sites: a new 12,400-square-foot building at 102 N. Ohio St., designed with a facade inspired by the gas station that stood there since around 1950, with about 7,200 square feet of retail and restaurant space plus 5,200 square feet of office space, and a renovation of the historic Mayer Building at 313 W. Pecan St., once home to the Mayer Foods grocery store, adding a 5,000-square-foot restaurant. Together the two projects are backed by up to $2.3 million in city incentives through Tax Increment Reinvestment Zone No. 11.
Here's the part worth knowing if you live nearby: none of this is fast. The incentive agreements set hard construction deadlines. Work on the Mayer Building must start by January 1, 2028 and wrap by June 1, 2029. The Ohio Street building has until October 1, 2028 to break ground and March 1, 2030 to finish. Downtown Celina's next real expansion is a 2029 and 2030 story, not a this-year story.
Three retailers, three days, one August
While downtown works through a multi-year construction calendar, the Preston Road corridor near Ownsby Parkway solved a different problem almost overnight. Home Depot opened August 20 at 3245 S. Preston Road. Academy Sports + Outdoors followed August 24 at 3525 S. Preston Road. Costco opened August 26 at 3445 S. Preston Road, bringing 158,000 square feet of warehouse retail to a stretch of road that didn't have a grocery anchor of that scale a year ago.
| Business | Address | Opened |
|---|---|---|
| Home Depot | 3245 S. Preston Road | Aug. 20, 2026 |
| Academy Sports + Outdoors | 3525 S. Preston Road | Aug. 24, 2026 |
| Costco | 3445 S. Preston Road | Aug. 26, 2026 |
| Fourteen Eighteen Coffee (Celina Station) | Ash St. & Preston Road | July 28, 2026 |
The corridor has been filling in around those anchors for months. Blaze Pizza landed at 3515 S. Preston Road, a locally owned Pickleman's Gourmet Cafe opened nearby billed as the first location of that chain in Texas, and Torchy's Tacos took a spot at 3505 S. Preston Road that the chain describes as its northernmost Texas location. Panda Express opened its first Celina store in late spring. Closer to downtown, the 18-acre Celina Station development brought in Fourteen Eighteen Coffee, a locally owned coffee brand with roots in Plano, at the end of July.
None of this required a construction deadline stretching into 2030. It required a summer.
The other kind of new: a patio built for staying an hour
Preston Road solved the errand problem. It did not solve the sit-down-for-a-while problem, especially if you live on Celina's west side. That's where The Creeks at Celina comes in, a 28,000 square foot dining and lifestyle project from Weitzman at the northwest corner of the Dallas North Tollway and Frontier Parkway, built around a six-acre pond with restaurant patios sized close to 900 square feet each.
The anchors are Haraz Coffee House, serving traditional Yemeni drinks like the Harazi Mufawar, made with coffee, cardamom, and cream, and Capo's Pizza & Pasta. The project sits about half a mile east of the newer H-E-B and works as the first walkable evening option for residents of Light Farms and Sutton Fields, who previously had to drive into the Preston corridor or downtown for anything beyond a grocery run.
The distinction matters more than it sounds. Preston Road is built for efficiency: park once, load the cart, get home. The Creeks is built to hold you for a while, with patios sized for lingering rather than turning tables fast.
What this means for the rest of the year
The Square isn't losing its role in any of this. It keeps the job it has always had: hosting the events that give the town its shape. Celina's Oktoberfest returns to the Square October 3, with the Chamber of Commerce bringing craft beer, live music, and German food to the historic district. Beware of the Square follows October 24. The next Friday Night Market, after the fall season kicked off September 4, lands November 6. Christmas on the Square closes out the year December 2.
Those events aren't waiting on Trackside Junction or the Ohio Street building. They run on the Square Celina already has, while the corridors on either side of town pick up the load that historic square footage was never built to carry.
If you already live here, the practical shift is worth noticing this fall. Quick errands now cluster on Preston Road, usually within a few minutes of wherever you are in Celina. A slower, patio-first evening option opened on the west side at The Creeks. And the Square itself won't meaningfully grow its restaurant inventory until construction wraps somewhere between 2029 and 2030. Knowing which zone does which job saves a fair amount of driving between now and then.
It also says something about how a city this size actually grows: not all at once, and not evenly, but in pieces that land in different corners in the same year and end up reshaping how people spend a Tuesday night without anyone announcing it.
We keep an eye on this kind of change because it's the texture of the town we work in every day. If you're curious about how these corridors line up with specific streets, school zones, or new-construction communities around Celina, our Celina neighborhood guide is a good place to start, and the team at Darna Real Estate Group is always glad to talk through what a particular block looks like up close. Book a meeting whenever you're ready.